Have a mobile piece of equipment on production floor that is not hardwired? Usually these types of equipment don’t have lockable switch but power source need to LOTO to work safely. Simply attach Electrical Plug Cover Lockout to frame of the equipment, so it would be there when LOTO will be required to perform setup, PM or repair.
Follow steps to perform plug lockout:
- Unplug the power cord from the outlet.
- Open the yellow container by sliding down.
- Place cord in the container
- Shut the container by closing and then pushing up.
- Place your lock on the container.
January 18, 2025
0 509
A Complete Guide to Lean Six Sigma DMAIC
January 2, 2025
0 974
The Art of Coaching and Self-Reflection
December 15, 2024
0 972
ISO 9001: Your Roadmap to Success
January 25, 2025
0 415
Unlocking the Power of CONWIP for Lean Manufacturing
January 24, 2025
0 404
Root Cause Analysis Stacking: A Game-Changer for Problem Solving
January 18, 2025
0 534
Lean Six Sigma Study Plan
January 18, 2025
0 509
A Complete Guide to Lean Six Sigma DMAIC
January 2, 2025
0 974
The Art of Coaching and Self-Reflection
December 15, 2024
0 972
ISO 9001: Your Roadmap to Success
January 25, 2025
0 415
Unlocking the Power of CONWIP for Lean Manufacturing
January 24, 2025
0 404
Root Cause Analysis Stacking: A Game-Changer for Problem Solving
January 18, 2025
0 534
Lean Six Sigma Study Plan
December 15, 2024
0 972
ISO 9001: Your Roadmap to Success
November 23, 2024
0 4,299
Identifying Phenomena for Minor Stops – 6 Gens
November 23, 2024
0 511
Revitalizing Business Models: The Role of Strategic KAIZEN Beyond Traditional KAIZEN
January 18, 2025
0 534
Lean Six Sigma Study Plan
January 17, 2025
0 420
Strategic KAIZEN: Senior Executives’ Mindset Overhaul
December 18, 2024
0 754
The Strategic KAIZEN Transformation
December 15, 2024
0 972
ISO 9001: Your Roadmap to Success
November 23, 2024
0 4,299
Identifying Phenomena for Minor Stops – 6 Gens
November 23, 2024
0 511
Revitalizing Business Models: The Role of Strategic KAIZEN Beyond Traditional KAIZEN
January 18, 2025
0 534
Lean Six Sigma Study Plan
January 17, 2025
0 420
Strategic KAIZEN: Senior Executives’ Mindset Overhaul
December 18, 2024
0 754
The Strategic KAIZEN Transformation
Most Popular
4M Analysis Process
The purpose of this procedure is to define the steps to do a 4M …