Enhancing Your Business Performance

  • Enhancing Your Business Performance
  • Home
  • Process Excellence
    • Lean Six Sigma
    • TPM
      • TPM Introduction
      • Change Management
      • Focused Improvement
      • Autonomous Maintenance
      • Education and Training
      • Quality
      • Safety, Health and Environment
      • Planned Maintenance
      • Early Equipment Management
    • TPS
    • Tools
      • Last Minute Travel Deals
      • 5 Why Analysis
      • Cap-Do
      • Kaizen
      • FMEA
      • One Point Lessons Directory
    • Templates
      • Machine Ledger
      • 5S Audit Checklist and Report
      • Cap-Do (PDCA)
      • One Point Lesson
      • FMEA template
      • M-P sheet (EEM) free template download
      • Why-Why Analysis
  • Free Courses
    • Lean Six Sigma White Belt Course
    • Lean Six Sigma Yellow Belt Course
    • Lean Six Sigma Green Belt Exam
    • Lean Six Sigma Black Belt Exam
    • TPM Instructor Course
    • Agile Retrospective: Continuous Improvement and Kaizen with Scrum
    • Autonomous Maintenance Facilitator
    • Planned Maintenance Facilitator
  • Submit a Post
  • Contact
Home Tools (page 19)

Tools

  • One slide Kaizen and Cap-Do (PDCA) cycle hybrid

    sensei February 15, 2018
    0 11,703
    Blog Cap-Do Focused Improvement Kaizen Root Cause Analysis

    Maximize the Overall Equipment Effectiveness, Process and Plants Through Uncompromising Elimination of Losses and Continuous Improvement of Performance. Step 1 – Identify The Situation Charter Team Collect available Data Classify Losses Step 2 – Justify The Situation Stratify Losses Select the Subject Verify Relevance to Site Master Plan Step 3 – Understand…

    Read More »
  • One Point Lesson Safety

    sensei February 11, 2018
    0 4,387
    Blog OPL

    To lower scissor lift (MEWP) due to emergency or power loss, turn “Emergency Lowering” valve counterclockwise. This OPL is only for reference – always follow safety rules prescribed by your local H&S department.

    Read More »
  • One point lesson electrical

    sensei February 11, 2018
    0 14,787
    Blog OPL

    When disconnecting power always follow Left Hand Rule – make sure packaging machine is stopped and all major electricity devices (main drive motor, electric heaters etc.) are turned off, then turn of main power disconnect using your left hand. This OPL is only for reference – always follow safety rules…

    Read More »
  • TPM Autonomous Maintenance Step 4 Lubrication Module. Part 1

    sensei January 9, 2018
    0 4,949
    Autonomous Maintenance Tools

    Purpose of Lubrication As shown in the figure, the lubricating fluid film between the two surfaces keeps the surfaces from making direct contact.  The very small particles of the lubricating fluid in the film move over each other reducing the friction between the surfaces. Training Objectives Describe the purpose of…

    Read More »
Previous page Next page

Most Popular

4M Analysis Process

sensei
August 29, 2018

The purpose of this procedure is to define the steps to do a 4M …

OPL – One Point Lesson Template – Free Download

sensei
November 5, 2018

PDCA – A Process Approach

sensei
January 8, 2023
5S - Sort, Set, Shine, Standardize, Sustain

5S Audit Checklist and Report

sensei
April 18, 2022

Why-Why Analysis

sensei
June 10, 2022

Recent

Gemba Walk GPT: The Smartest Way to Turn Observations Into Real Improvement

How to Create a Step-by-Step Reveal Animation in PowerPoint

Explore the Best Free Online Libraries in 2025

TPM Master Plan: The Roadmap to World-Class Manufacturing

Blog Search

Lean Manufacturing is a methodology for producing goods that emphasizes minimizing waste and maximizing efficiency. It is a manufacturing philosophy that aims to produce goods with the least amount of resources, time and effort. Lean manufacturing aims to eliminate waste and improve the flow of materials and information throughout the production process. This approach is often used in manufacturing environments where efficiency and cost-effectiveness are critical, such as in the automotive and electronics industries.
Copyright © 2025 improvement.company
  • Terms of Use
  • Privacy Policy
  • About Our Ads

Popular Posts

4M Analysis Process

sensei
August 29, 2018

The purpose of this procedure is to define the steps to do a 4M …

OPL – One Point Lesson Template – Free Download

sensei
November 5, 2018

PDCA – A Process Approach

sensei
January 8, 2023
5S - Sort, Set, Shine, Standardize, Sustain

5S Audit Checklist and Report

sensei
April 18, 2022

Most Popular Tools

Toyota Production system. Jidoka and Just-in-Time are two pillars of TPS.

How to Drive Lasting Change with Kaizen Mindsets

Innovation vs. Kaizen Explained

How Kaizen and PMP Work Together

Root Cause Analysis Stacking: A Game-Changer for Problem Solving